Home  /  Projects /  Conveyors

Conveyors

MGA has specialized knowledge in conveyor systems used for bulk materials handling for mining and port facilities, including the design and engineering of the various structural and mechanical components. 

Related

Services

Hover over the markers and click to jump to section

Conveyor Projects

Los Pelambres Conveyor System

Chile

Project Name:

Client:

Location:

Project Timeline:

Project Data:

  • System Length: 12,700 m

  • Longest Conveyor: 5,630 m

  • Drop of System: 1,300 m

  • Design Capacity: 8,700 mtph

  • Belt Speed: 6.0 m/s

  • Conveyor Width: 72”

MGA Scope of Work:

  • Structural EOR

 
 

Pierina Overland Conveyor

Peru

Project Name:

Client:

Location:

Project Timeline:

Project Data:

  • Conveyor Length: 2,400 m

  • Design Capacity: 2,000 mtph

  • Belt Speed: 3.9 m/s

  • Conveyor Width: 54”

  • Material: Gold crushed ore

MGA Scope of Work:

  • Structural EOR

Ujina Rosario Transition Project - Collahausi

Chile

Project Name:

Client:

Location:

Project Timeline:

Project Data:

  • Conveyor Length: 2,400 m

  • Design Capacity: 8,500 mtph

  • Conveyor Width: 72”

  • Power operating (kW): 1500/7865/-6500

  • Material: Copper Ore

MGA Scope of Work:

  • Structural EOR

Photos coming soon

Steepbank Dry Stacking Conveyors

Suncor-ThyssenKrupp Canada

Fort McMurray, Alberta, Canada

2003-2006

Project Name:

Client:

Location:

Project Timeline:

Project Data:

  • Design Capacity: 12,000 tph

  • Length: (A) 248 and (B) 358 m

  • Installed power: T50 (A) 1910 kW T51 (B) 2070 kW

  • Material: Crushed Oil Sands

MGA Scope of Work:

  • Structural EOR

 
 

Oyu Tolgoi Mine

Sandvic

Mongolia

2009-2014

Project Name:

Client:

Location:

Project Timeline:

MGA Scope of Work:

  • Technical support for the overland conveyor

  • Drive Support assessment

  • Coarse Ore Tripper design trouble shooting

Bloom Lake Stacker Conveyor

Takraf

Quebec, Canada

2011-2012

Project Name:

Client:

Location:

Project Timeline:

Project Data:

  • Design Capacity: 15,000 mtph

  • Length: 80 m

  • Lift: 16 m

  • Belt: 2438 mm, P2100/6 19/6

  • Material: Crushed Iron Ore

MGA Scope of Work:

  • EOR for the structural design and analysis

  • Integration of mechanical system